Hi-Desert Water District Warren Valley Basin Groundwater Recharge

3 Documents in Project

Summary

SCH Number
2004041119
Lead Agency
Hi-Desert Water District
Document Title
Hi-Desert Water District Warren Valley Basin Groundwater Recharge
Document Type
NOD - Notice of Determination
Received
Posted
6/10/2004
Present Land Use
Land Uses vary, but is primarily residential.
Document Description
The project consists of the following activities: Install approximately 7,000 lineal feet of 24-inch PVC pipeline. The maximum area of surface disturbance is estimated at 140,000 sq. ft. or approximately 3.21 acres. The construction of a recharge area containing two separate basins. Each basin will be approximately 5 acres in size. Other facilities include the flow control facility, which will disturb another 3,000 sq. ft. or 0.07 of an acre of the recharge basin site surface, and approximately 555 cubic yards of soil (to a 5-foot depth). The 3 monitoring wells and one extraction well will be developed according to typical District specifications.

Contact Information

Name
Pat Grady
Agency Name
Hi-Desert Water District
Contact Types
Lead/Public Agency

Location

Cities
Yucca Valley
Counties
San Bernardino
Total Acres
15 +
State Highways
62
Township
1 N
Range
5 E
Section
Multi.
Base
SBBM
Other Information
The proposed project is located within the Town of Yucca Valley in the County of San Bernardino. The 24-inch pipeline will begin at the intersection of Sunnyslope Drive and Sage Avenue, head due west and then southwest to the intersection of Cholla Avenue and Buena Vista Drive, and generally parallel Buena Vista Drive until it intersects with Cherokee Trail, in Township 1 North, Range 5 east and Sections 34 and 35, San Bernardino Base & Meridian (SBBM). The proposed alignment follows the existing 16-inch Four Corners Petroleum pipeline route. The pipeline length is 7,000 feet. An approximate 10-acre recharge basin site is located just to the east of Pioneertown Road and south of Buena Vista Drive, to the southeast of quarter of Section 34, Township 1 North, Range 5 east, SBBM. The recharge site is located on land owned by the District, which already has other water facilities, including Wells #2, 3, and 9.

Notice of Determination

Approving Agency
Hi-Desert Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A