Hi-Desert Water District Warren Valley Basin Groundwater Recharge
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2004041119
- Lead Agency
- Hi-Desert Water District
- Document Title
- Hi-Desert Water District Warren Valley Basin Groundwater Recharge
- Document Type
- NEG - Negative Declaration
- Received
- Present Land Use
- Land Uses vary, but is primarily residential.
- Document Description
- The project consists of the following activities: Install approximately 7,000 lineal feet of 24-inch PVC pipeline. The maximum area of surface disturbance is estimated at 140,000 sq. ft. or approximately 3.21 acres. The construction of a recharge area containing two separate basins. Each basin will be approximately 5 acres in size. Other facilities include the flow control facility, which will disturb another 3,000 sq. ft. or 0.07 of an acre of the recharge basin site surface, and approximately 555 cubic yards of soil (to a 5-foot depth). The 3 monitoring wells and one extraction well will be developed according to typical District specifications.
- Contact Information
-
Pat Grady
Hi-Desert Water District
55439 Twentynine Palms Highway
Yucca Valley, CA 92284
Phone : (760) 365-8333
Location
- Cities
- Yucca Valley
- Counties
- San Bernardino
- Total Acres
- 15 +
- State Highways
- 62
- Township
- 1 N
- Range
- 5 E
- Section
- Multi.
- Base
- SBBM
- Other Information
- The proposed project is located within the Town of Yucca Valley in the County of San Bernardino. The 24-inch pipeline will begin at the intersection of Sunnyslope Drive and Sage Avenue, head due west and then southwest to the intersection of Cholla Avenue and Buena Vista Drive, and generally parallel Buena Vista Drive until it intersects with Cherokee Trail, in Township 1 North, Range 5 east and Sections 34 and 35, San Bernardino Base & Meridian (SBBM). The proposed alignment follows the existing 16-inch Four Corners Petroleum pipeline route. The pipeline length is 7,000 feet. An approximate 10-acre recharge basin site is located just to the east of Pioneertown Road and south of Buena Vista Drive, to the southeast of quarter of Section 34, Township 1 North, Range 5 east, SBBM. The recharge site is located on land owned by the District, which already has other water facilities, including Wells #2, 3, and 9.
Notice of Completion
- Review Period Start
- Review Period End
- Development Type
- Water Facilities
- Local Action
- Other Action Other Action: Water infrastructure
- Project Issues
- Air Quality Archaeologic-Historic Flood Plain/Flooding Geologic/Seismic Noise Soil Erosion/Compaction/Grading Vegetation Water Quality Water Supply Wildlife
- Reviewing Agencies
- California Department of Conservation California Department of Health Care Services California Department of Parks and Recreation California Department of Transportation, District 8 California Native American Heritage Commission California Regional Water Quality Control Board, Colorado River Basin Region 7 California State Lands Commission Department of Fish and Wildlife, Region 6 Department of Water Resources Resources Agency State Water Resources Control Board, Division of Water Quality State Water Resources Control Board, Division of Water Rights State Water Resources Control Board, Divison of Financial Assistance
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.