Miossi Road Water Main Relocation

2 Documents in Project

Summary

SCH Number
2004041118
Lead Agency
City of San Luis Obispo
Document Title
Miossi Road Water Main Relocation
Document Type
NOD - Notice of Determination
Received
Posted
6/7/2004
Present Land Use
C/OS-4 and R-1-S within City Limits, and Agricultural within the County
Document Description
The proposed project is construction of a new 16-inch water transmission main (Specification #99211), to replace/reroute the existing aging and failing 14-inch welded steel water transmission line. The new waterline will connect to the existing transmission main at the entrance to Cuesta Park on Loomis Street near the northeasterly City Limits, and travel northerly along the gravel shoulder of the old abandoned concrete State highway now known as Miossi Road for approximately 920 meters where it will connect to the City's Reservoir No. 1. The project will also include installation of water service lines to tie back in and continue to serve the Police Department Rifle Range, Cuesta Park and the veterinary hospital all of which are currently served from the existing line that will be abandoned. Construction is estimated to begin in the summer of 2004 of spring of 2005 and is anticipated to take roughly 4-6 months to complete. The project will take place primarily in an easement obtained from the current landowner and within the County right-of-way.

Contact Information

Name
John Shoals
Agency Name
City of San Luis Obispo
Contact Types
Lead/Public Agency

Location

Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
Loomis Street and Old Highway 101 R-O-W
State Highways
101
Other Information
Location: Northeast of the City of San Luis Obispo near Cuesta Park and the Cuesta Grade

Notice of Determination

Approving Agency
Community Development Director
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print