West Kern Water District Turn-In No. 1

3 Documents in Project

Summary

SCH Number
2004041098
Lead Agency
West Kern Water District (WKWD)
Document Title
West Kern Water District Turn-In No. 1
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2005
Present Land Use
The land is the California Aqueduct operated by the Department of Water Resources. Designation is Exclusive Agriculture.
Document Description
The proposed project provides for the introduction of local groundwater into the California Aqueduct in Reach 13B, and for its delivery by exchange for State Water Project Water to Turnout No. 3 in Reach 12D of the California Aqueduct for use at the La Paloma Generating Project during short water years. In order to use the existing temporary turn-in Reach 13D for the introduction of local groundwater into the California aqueduct on an on-going basis, it will be modified by installing an 18" diameter coated steel pipe turn-in structure. The structure will be complete with inline valve, flow meter, and concrete deck with pipe supports, concrete steps with handrails, block retraining wall, and security fencing.

Contact Information

Name
Craig Trombly
Agency Name
Department of Water Resources
Contact Types
Lead/Public Agency

Location

Counties
Kern
Cross Streets
Tupman Road
Zip
93276
Total Acres
<1
Parcel #
160-210-04-00
State Highways
119
Schools
Elk Hills School District
Waterways
California Aqueduct
Township
30S
Range
25E
Section
32
Base
MDB&M

Notice of Determination

Approving Agency
Department of Water Resources
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.