West Kern Water District Turn-In No. 1

3 Documents in Project

Summary

SCH Number
2004041098
Lead Agency
West Kern Water District (WKWD)
Document Title
West Kern Water District Turn-In No. 1
Document Type
NOD - Notice of Determination
Received
Posted
9/14/2004
Present Land Use
The land is the California Aqueduct operated by the Department of Water Resources. Designation is Exclusive Agriculture.
Document Description
The proposed construction project objectives are the introduction of water into the California Aqueduct, and through water exchange between Kern County Water Agency and West Kern Water District to meet the water demand for the La Paloma Generating Company, LLC, in the event of a short water year. Water received from the State Water Project would have to fall below 6,500 acre feet before the proposed turn-in structure would be used. Water would then be pumped from the WKWD groundwater supply into the California Aqueduct to meet the La Paloma needs. The proposed construction project is the installation of an 18" diameter coated steel pipe turn-in structure to the California Aqueduct. The structure will be complete with inline valve, flow meter, concrete deck with pipe supports, concrete steps with handrails, block retaining wall, and security fencing.

Contact Information

Name
Jerry W. Pearson
Agency Name
West Kern Water Agency
Contact Types
Lead/Public Agency

Location

Counties
Kern
Cross Streets
Tupman Road
Zip
93276
Total Acres
<1
Parcel #
160-210-04-00
State Highways
119
Schools
Elk Hills School District
Waterways
California Aqueduct
Township
30S
Range
25E
Section
32
Base
MDB&M

Notice of Determination

Approving Agency
West Kern Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.