NOD Addendum 7 Precise Development Plan and Desalination Plant Project

16 Documents in Project

Summary

SCH Number
2004041081
Lead Agency
San Diego County Water Authority
Document Title
NOD Addendum 7 Precise Development Plan and Desalination Plant Project
Document Type
NOD - Notice of Determination
Received
Posted
5/16/2022
Document Description
Modifications to the Carlsbad Desalination Project (CDP), design modification would include installation of a partially submerged intake system in the Lagoon (including new DFS structure, new deck structure, and a floating boom). A debris return area, which would include a debris bin, and debris pipeline, would be constructed between the discharge pond and intake system. In addition, modifications include the installation of a prefabricated electrical building, the demolition of the marine research shed and relocation and replacement with a portable container and the of the existing EPS intake screens and channels and the 72-inch feeder line, the discharge channel, and construction of a new 72-inch intake pipeline (feeder) and vault.

Contact Information

Name
Summer Adleberg
Agency Name
San Diego County Water Authority
Job Title
Principal Water Resource Specialist
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Regions
Southern California
Cross Streets
Carlsbad Blvd.
Zip
92008
State Highways
Interstate 5
Railways
NTDS
Airports
N/A
Schools
N/A
Waterways
Pacific Ocean
Other Location Info
4600 Carlsbad Boulevard, Carlsbad, San Diego County, CA 92008

Notice of Determination

Approving Agency
San Diego County Water Authority
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
https://www.sdcwa.org/

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print