Supplemental tot he Precise Development Plan and Desalination Plant Project Final EIR

16 Documents in Project

Summary

SCH Number
2004041081
Lead Agency
City of Carlsbad
Document Title
Supplemental tot he Precise Development Plan and Desalination Plant Project Final EIR
Document Type
NOD - Notice of Determination
Received
Posted
8/26/2016
Present Land Use
Public Utilities (U) for desalination plant site and surrounding power station. Land uses, zoning and General Plan designations vary for the offsite pipeline.
Document Description
The proposed CDP modifications to facilitate permanent stand-alone operation of the CDP consist of construction and operations of a new screening/fish-friendly pumping structure, a fish return system, and auxiliary facilities. Additional processing improvements could potentially increase annual average production from the existing 50 mgd to 55 mgd in the future. As a permanent stand-alone facility, a maximum of 299 mgd of seawater would be withdrawn from the Agua Hedionda Lagoon: up to 127 mgd for processing by the CDP, up to 198 mgd for flow augmentation used for brine dilution, and approx. 1 mgd for screen wash and fish return. The flow rates for processing and flow augmentation are interrelated such that to total flow rate, inclusive of processing, flow augmentation, screen wash and fish, return will not exceed 299 mgd. Up to 60 mgd of the diverted seawater would be converted to fresh water that is delivered to the Water Authority at the CDP property line. The remaining flow (up to 67 mgd) and treated backwash water from the pretreatment filters (up to 7 mgd). The salinity of the discharge prior to dilution is approx. 64 ppt (67 ppt with no backwash water included), whereas the average salinity of the seawater in the vicinity of the discharge tunnel is 33.5 ppt. Poseidon is proposing an initial dilution of the brine to 42 ppt or less prior to discharge to the ocean. This is accomplished by mixing the CDP discharge with the flow augmentation seawater. The combined CDP discharge, flow augmentation and fish return system flow rate is up to 244 mgd. As compared to the existing project operations, the modified CDP operations described above would achieve a potential 10% average annual increase in fresh drinking water production while reducing the total quantity of seawater required for processing and brine dilution purposes.

Contact Information

Name
Mark TEgio
Agency Name
San Diego County Water Authoirty
Contact Types
Lead/Public Agency

Location

Cities
Carlsbad, Oceanside, San Marcos, Vista
Counties
San Diego
Cross Streets
Carlsbad Blvd. / Cannon Road
Zip
92008
Total Acres
4 + offsite pipe
Parcel #
Multiple
State Highways
I-5, SR-78
Railways
NCTD
Airports
Palomar-McClellan
Schools
Multiple
Waterways
Pacific Ocean, Aguas Hedionda Lagoon and tributary drainages
Township
Multi.
Range
Multi.
Section
Multi.

Notice of Determination

Approving Agency
San Diego County Water Authority
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print