State Route 138 Realignment Project, East of I-5 (Streambed Alteration Agreement No. 1600-2015-0035-R6)

6 Documents in Project

Summary

SCH Number
2004041045
Lead Agency
California Department of Transportation, District 8
Document Title
State Route 138 Realignment Project, East of I-5 (Streambed Alteration Agreement No. 1600-2015-0035-R6)
Document Type
NOD - Notice of Determination
Received
Posted
8/3/2015
Present Land Use
Transportation facility surrounded by undeveloped USFS land
Document Description
CDFW is executing Streambed Alteration Agreement No. 1600-2015-0035-R6, pursuant to section 1602 of the Fish and Game Code to the Permittee, Caltrans, represented by Mr. Scott Quinnell. The SR138 Realignment Project, East of I-15 (project) includes the construction of three new bridges and wildlife crossings, placement of fill within CDFW jurisdiction, construction of eleven culverts associated with construction of 2.1 miles of 2-lane (39.4 ft wide) highway, removal of 15 existing culverts, and restoration of streambed currently within the existing roadway. The project also includes the demolition or obliteration and subsequent restoration of the existing roadway. The project will result in permanent impacts to 4.0 acres of CDFW jurisdictional, vegetated streambed and temporary impacts to 0.9 acres of CDFW jurisdictional, vegetated streambed. Ingress/egress will occur from the existing roadway, shall avoid all identified wetland areas, and minimize impacts to streambed habitats to the greatest possible extent.

Contact Information

Name
Heidi Calvert
Agency Name
CDFW Inland Deserts Region
Contact Types
Lead/Public Agency

Location

Cities
Hesperia
Counties
San Bernardino
Cross Streets
Interstate 15 and Summit Post Office Road
Total Acres
~89
State Highways
Interstate 15
Railways
BNSF
Waterways
Crowder Creek, Horsetheif Creek
Township
3 N
Range
5W, 6W
Section
Multi.
Base
SBD
Other Information
Section: 19, 30, 29, 25, 24

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print