Foothill Boulevard Improvements / Pre-Zoning 04-00003 / Annexation 04-00004 Project
2 Documents in Project
Summary
SCH Number
2004041038
Lead Agency
City of Fontana
Document Title
Foothill Boulevard Improvements / Pre-Zoning 04-00003 / Annexation 04-00004 Project
Document Type
NOD - Notice of Determination
Received
Posted
6/21/2004
Present Land Use
Current County Commercial (CG, CN) and Residential (RL-3, RM-7) designations proposed to be changed to City Commercial (C-C) and Residential (R-SF) designations. Existing flood control channel and elementary school are proposed for Open Space (OS) and Public Facility (P-PF) designations, respectively.
Document Description
The proposed project (prezoning/annexation) encompasses approximately 92.42 +/- acres; the street improvements include approximately 2.2 mile stretch on Foothill Boulevard. The project site is within Fontana's Unincorporated sphere of influence.
Contact Information
Name
Don Williams
Agency Name
City of Fontana
Contact Types
Lead/Public Agency
Phone
Location
Cities
Fontana
Counties
San Bernardino
Cross Streets
Foothill Boulevard / Cherry Avenue
Zip
92336
Total Acres
92.4
Parcel #
117 (229-051-01 et al)
Railways
UP, BNSF, Metrolink, SCRRA
Schools
Fontana U.S.D. (10 schools)
Waterways
Etiwanda Creek Channel, Etiwanda San Sevaine Flood Control Channel
Township
1 S
Range
6 W
Section
1-4
Notice of Determination
Approving Agency
City of Fontana
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.