Fusari Mini Storage
2 Documents in Project
Summary
SCH Number
2004039003
Lead Agency
Monterey County
Document Title
Fusari Mini Storage
Document Type
NOD - Notice of Determination
Received
Posted
7/20/2006
Document Description
The proposed project would construct 57,400 square foot multi-building mini-storage facility and 800 square foot office building adjacent to the creek. Towards the northern portion of the property, a precast "conspan" bridge would be constructed over the creek, which divides the property. An excavator operated from the top of the back would remove material to create footings. The precast bridge structures would be placed on the footings to create the bridge. Two large oaks and three acacia trees would be removed to accommodate the bridge. Along the southern portion of the property, Prunedale North Road would be widened to create a pedestrian footpath along the left bank of the stream (looking downstream). Willow cuttings would be placed among the rock slope protection to hold the soil in place and provide riparian cover for the stream. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2006-0034-3 pursuant to Section 1602 of the Fish and Game Code to the project operator, Mr. Gary Fusari.
Contact Information
Name
Serge Glushkoff
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Address
Phone
Email
Location
Counties
Monterey
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.