Final Initial Study/Mitigated Negative Declaration for the Interim Remedial Action Plan ("IRAP"), Humble/PS Trading Tank Farm, Oakland International Airport;

2 Documents in Project

Summary

SCH Number
2004032152
Lead Agency
Port of Oakland
Document Title
Final Initial Study/Mitigated Negative Declaration for the Interim Remedial Action Plan ("IRAP"), Humble/PS Trading Tank Farm, Oakland International Airport;
Document Type
NOD - Notice of Determination
Received
Posted
5/24/2004
Present Land Use
General Industrial/Transportation City of Oakland General Plan Land Use Desigation: Heavy Industrial
Document Description
The Project Sponsor proposes to implement IRAP to remove jet fuel and polychlorinated biphenyls ("PCBs") from soil underlying portions of the site. The proposed project will involve excavating and removing approximately 2,363 tons of contaminated soil from the southern corner of the Humble/PST Tank Farm, abandoning two existing wells, installing replacement wells, and removing about 100 feet of two 12-inch underground jet fuel pipelines and an associated 34 tons of soil.

Contact Information

Name
James McGrath
Agency Name
Oakland, Port of
Contact Types
Lead/Public Agency

Location

Cities
Oakland
Counties
Alameda
Cross Streets
Edward White Way
Zip
94621
Total Acres
10
Parcel #
42-4540-2-1
State Highways
I 880/I 61
Railways
Pacific Corridor
Airports
Oakland International
Waterways
San Francisco Bay

Notice of Determination

Approving Agency
Port of Oakland
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No