River Road Viaduct Near Eagle Nest Lane

2 Documents in Project

Summary

SCH Number
2004032145
Lead Agency
Sonoma County
Document Title
River Road Viaduct Near Eagle Nest Lane
Document Type
NOD - Notice of Determination
Received
Posted
5/25/2004
Present Land Use
Public Roadway, Rural Residential
Document Description
The Department of Transportation and Public Works proposes the construction of a one lane, three-span viaduct above a landslide area on River Road 300 feet west of Eagle Nest Lane in Rio Nido. The viaduct well be approximately 140 feet long and 20 feet wide. Additionally, the existing 60-foot viaduct (east of the new viaduct) will be widened by one foot to create a consistent shoulder width of eight feet on the east bound lane in the project area. Guard rail will be replaced at the project site for approximately 200 feet. The project will prevent future undermining of the roadway by potential landslides. Construction of the viaduct will require the east-bound travel lane to be closed to through traffic. One-lane traffic control will be installed with temporary traffic signals at both ends of the project site.

Contact Information

Name
Alynn Kjeldsen
Agency Name
Sonoma County Permit and Resources Management Department
Contact Types
Lead/Public Agency

Location

Counties
Sonoma
Cross Streets
River Road / Eagle Nest Lane
Zip
95446
Parcel #
No. County Right of Way
State Highways
116
Schools
Guerneville School District
Waterways
Russian River
Township
8 N
Range
10 W
Section
21
Base
MD
Other Location Info
Nearest City: Rio Nido

Notice of Determination

Approving Agency
Sonoma County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A