A Modified Full Solid Waste Facilities Permit No. 48-AA-0083 for the Jepson Prairie Organics COmposting Facility, Solano COunty
12 Documents in Project
Summary
SCH Number
2004032138
Lead Agency
Solano County
Document Title
A Modified Full Solid Waste Facilities Permit No. 48-AA-0083 for the Jepson Prairie Organics COmposting Facility, Solano COunty
Document Type
NOD - Notice of Determination
Received
Posted
12/2/2009
Document Description
Windrow composting and the use of in-vessel aerated static pile (ASP) composting were proposed for use at the JPO in the subsequent EIR. The composting proposal for this CMHFP modification is for the use of tarps to seal windrows [modified in-vessel] and applu and extract air pressure using the aerated static pile (ASP) method for dispensing off-gases through a biofilter. This method of composting will be located on the impermeable portion of the facility and was addressed, analyzed, and mitigated in the Subsequent EIR.
Contact Information
Name
Beatrice Poroli
Agency Name
California Integrated Waste Manangement Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Dixon, Fairfield
Counties
Solano
Cross Streets
Hwy 113 and Hay Road
Zip
95687
Total Acres
256
Parcel #
42-020-02, -06, -08
State Highways
SR 113
Railways
Bay Area Electric
Airports
Travis AFB
Waterways
Ulatis Creek
Base
Dozier
Other Location Info
Located approximately 8 miles southeast of the City of Vacaville, adjacent to Highway 113, at 6426 Hay Road.
Notice of Determination
Approving Agency
CA Integrated Waste Management Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.