Vineyard Point Amended Vesting Tentative Map Special Development Permit and Housing Plan
14 Documents in Project
Summary
SCH Number
2004032104
Lead Agency
Sacramento County
Document Title
Vineyard Point Amended Vesting Tentative Map Special Development Permit and Housing Plan
Document Type
NOD - Notice of Determination
Received
Posted
5/2/2017
Present Land Use
Undeveloped pasture / RD-7 and RD-10 / Low Density Residential
Document Description
Construction activities include: installation of 10 cobble lined drop structures, bank rock slope protection, one 72-inch pipe diameter concrete outfall structure, one 24-inch pipe diameter concrete outfall structure, two 18-inch pipe diameter concrete outfall structures, extensions of one existing 24-inch diameter discharge pipe and two existing 18 inch diameter discharge pipes, filling-in and re-grading of the existing creek to allow surface drainage to flow into the re-aligned creek.
Contact Information
Name
James Herota
Agency Name
Central VAlley Flood Protection Board
Contact Types
Lead/Public Agency
Phone
Location
Counties
Sacramento
Cross Streets
Gerber Road / Bradshaw Road
Total Acres
35.2 +/-
Parcel #
066-0080-024 (portion)
Schools
Sheldon HS and MS
Waterways
Gerber, Elder, Union House (aka Beacon), and Laguna Creeks
Township
7N
Range
6E
Section
5
Base
MD
Other Location Info
Community: Vineyard
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.