North Vineyard Station Specific Plan Amendment

14 Documents in Project

Summary

SCH Number
2004032104
Lead Agency
Sacramento County
Document Title
North Vineyard Station Specific Plan Amendment
Document Type
NOD - Notice of Determination
Received
Posted
12/20/2016
Present Land Use
Undeveloped pasture / RD-7 and RD-10 / Low Density Residential
Document Description
Project improvements include drainage features and will re-align, deepen, and widen Elder Creek for approx. 1 mile. Construction activities include: installation of twenty-one cobble lined drop structures; one 42-inch and one 66-inch pipe diameter concrete outfall structure; three concrete lined access ramps; realigning four existing 36-inch culverts at McCoy Ave.; replacing the existing bridge at Florin Road with three 14-feet high by 10 feet wide box culverts; and the removal of an abandoned rail road bridge.

Contact Information

Name
James Herota
Agency Name
Central VAlley Flood Protection Board
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Cross Streets
Gerber Road / Bradshaw Road
Total Acres
35.2 +/-
Parcel #
066-0080-024 (portion)
Schools
Sheldon HS and MS
Waterways
Gerber, Elder, Union House (aka Beacon), and Laguna Creeks
Township
7N
Range
6E
Section
5
Base
MD
Other Location Info
Community: Vineyard

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print