Summary
- SCH Number
- 2004032104
- Lead Agency
- Sacramento County
- Document Title
- Elder Creek- Phase 4 (Lake or Stremabed Alteration Agreement No. 1600-2017-0006-R2)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/18/2018
- Present Land Use
- Undeveloped pasture / RD-7 and RD-10 / Low Density Residential
- Document Description
- Approval of Permit No. 19045-3, under california Code of regulations, Title 23, Section 6, for work within an adopted plan to flood control, within a Regulated Stream (Table 8.1; Title 23, Div. 1, Article 8): To replace a railroad bridge crossing Elder Creek with three (3) prefabricated 10-foot x 13-foot monolithic box culverts.
- Contact Information
-
James Herota
Central Valley Flood Protection Bd
Lead/Public Agency
3310 El Camino Ave., Suite 170
Sacramento, CA 95821
Phone : (916) 547-0651
Location
- Counties
- Sacramento
- Cross Streets
- Florin Rd.,
- Total Acres
- 35.2 +/-
- Parcel #
- 066-0080-024 (portion)
- Schools
- Sheldon HS and MS
- Waterways
- Elder Creek
- Township
- 7N
- Range
- 6E
- Section
- 5
- Base
- MD
- Other Location Info
- Community: Vineyard
Notice of Determination
- Approving Agency
- Central Valley Flood Protection Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 3310 El Camino Ave., Suite 170, Sacramento, CA 95821
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.