Pond 1 Expansion Project

2 Documents in Project

Summary

SCH Number
2004032053
Lead Agency
Town of Windsor
Document Title
Pond 1 Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
4/26/2004
Present Land Use
Wastewater Treatment Facility, Public / Quasi Public / Institutional
Document Description
The Town proposes to increase the storage capacity of the existing high flow storage Ponds 1 and 2 by removing the common embankment separating the two ponds, raising the outer embankments by up to eight feet, and expanding the footprint of the proposed combined pond to the north and west. Ponds 1 and 2 currently have a combined storage capacity of approximately 17.6 MG. The Project will increase the available storage capacity to approximately 37.3 MG, providing the means to store increased high flows anticipated as the Town of Windsor approaches build out. The proposed expansion of Pond 1 will not result in a change in the use of the ponds, only the capacity. The pond will still be used for winter high-flow storage on an intermittent basis, for maintenance procedures and emergency storage. The town will include tree planting along the northern toe of the embankment to provide visual screening. Other project components include modifications to an existing pump station, piping and appurtenances impacted by pond modifications.

Contact Information

Name
James Smith
Agency Name
City of Windsor
Contact Types
Lead/Public Agency

Location

Cities
Windsor
Counties
Sonoma
Cross Streets
Windsor Road, Windsor River Road
Zip
95492
Total Acres
5
Parcel #
164-030-035
State Highways
US 101
Railways
Northwestern Pacific
Airports
Sonoma Count
Schools
Windsor High, Windsor MS, Windsor Creek, Cali Calmecac
Waterways
Russian River, Windsor Creek, Pool Creek
Township
8N
Range
9W
Section
9&10
Base
MDBM

Notice of Determination

Approving Agency
Town of Windsor
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.