Dan Morgan

2 Documents in Project

Summary

SCH Number
2004032025
Lead Agency
Humboldt Community Services District
Document Title
Dan Morgan
Document Type
NOD - Notice of Determination
Received
Posted
4/26/2004
Present Land Use
The site is relatively flat. The parcel is underdeveloped and the existing vegetation is seasonal grass currently used as pasture. Adjacent properties are planned, zoned and developed for residential use. Present Zoning: Residential One-Family with Manufactured Home, Airport Safety Review and Streamside Management Areas/Wetlands combining zone. Present General Plan: Residential Low Density (RL); McKinleyville Community Plan (MCCP).
Document Description
Approval of tentative map for the subdivision of an approximate 5.5 acres into 26 residential lots and Parcel X for the stormwater detention facility. The residential lots range in size from 5,846 to 9,640 square feet. The subdivision requires an exception to the lot frontage requirement to allow for flag lot configuration.

Contact Information

Name
Anita Punla
Agency Name
Humboldt Community Services District
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
Underwood Road & Court
Zip
95519
Total Acres
5.5
Parcel #
511-081-69
State Highways
101
Airports
Arcata/Eureka Airport
Schools
McK Elementary
Waterways
Norton Creek
Township
7N
Range
1E
Section
30
Base
HM
Other Location Info
City: McKinleyville

Notice of Determination

Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print