Vista Del Sol Storm Drain Project

2 Documents in Project

Summary

SCH Number
2004031120
Lead Agency
City of Three Arch Bay
Document Title
Vista Del Sol Storm Drain Project
Document Type
NOD - Notice of Determination
Received
Posted
5/4/2004
Present Land Use
Residential (no changes planned)
Document Description
The proposed Vista Del Sol Storm Drain Project involves new construction and reconstruction of storm drains along Vista del Sol and La Senda street within the private community known as Three Arch Bay in south Laguna Beach. The project includes contruction of approximately 3,000 feet of new storm drain lines, 20 new catch basins, several new manholes, relocation of an existing ocean drain outlet, and abandonment of several older lines. Related improvements include rehabilitating an existing debris basin partially within the Aliso and Woods Canyon Wilderness Park that will convey urban runoff into the new storm drains. New storm drains will be located within street right-of-way except the ocean outlet which will be constructed by hand excavation in a tunnel beneath or adjacent to three private properties, but will not pass under any structures.

Contact Information

Name
Drew Harper
Agency Name
City of Three Arch Bay
Contact Types
Lead/Public Agency

Location

Cities
Laguna Beach
Counties
Orange
Cross Streets
PCH / Vista Del Sol
Zip
92651
Schools
Del Obispo Elementary, Capistrano Valley U.S.D
Waterways
Pacific Ocean
Township
8 S
Range
8 W
Section
8

Notice of Determination

Approving Agency
Three Arch Bay CSD
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.