National Cement Tire Derived Fuel Project

4 Documents in Project

Summary

SCH Number
2004031077
Lead Agency
Kern County Air Pollution Control District
Document Title
National Cement Tire Derived Fuel Project
Document Type
NOD - Notice of Determination
Received
Posted
12/13/2004
Present Land Use
Existing Industrial Facility (Cement Plant) / M-3 Manufacturing
Document Description
The project is located approximately five miles east of I-5 and approximately five miles north of Highway 138. National Cement Company of California, Inc. (National Cement) operates an existing cement manufacturing facility near Lebec, California. National Cement proposes to use tire-derived fuel (TDF) in the form of chipped automobile and truck tires as a partial replacement for up to 25 percent of the primary fuel (petroleum coke) used in the facility's pyroprocessing system. The project requires minor modifications to the existing plant (TDF storage pad and TDF handling system), and would not affect cement production levels at the facility.

Contact Information

Name
Thomas Paxson
Agency Name
Kern County Air Pollution Control District
Contact Types
Lead/Public Agency

Location

Counties
Kern
Cross Streets
~ 5 miles E and N of Highway 138 / I-5 Intersection
Zip
93243
Total Acres
0.25
Waterways
California Aqueduct
Township
9N
Range
18W
Section
35
Base
SBBM
Other Location Info
City: Lebec

Notice of Determination

Approving Agency
Board of Directors of Kern County Air Pollution Control District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print