Rosedale Highway (SR 58) Widening Project

2 Documents in Project

Summary

SCH Number
2004031018
Lead Agency
City of Bakersfield
Document Title
Rosedale Highway (SR 58) Widening Project
Document Type
NOD - Notice of Determination
Received
Posted
6/4/2004
Present Land Use
Rosedale Highway (SR 58) is designated as an Arterial under the Circulation Element of the Metropolitan Bakersfield General Plan.
Document Description
The project is widening Rosedale Highway (State Route 58) from four to six lanes in the City of Bakersfield, between Gibson Street and Highway 99, with reconstructed medians and modified signals at the intersections of Rosedale Highway and Gibson Street, Rosedale Plaza, and Camino Del Rio Court. Access to Highway 99 southbound and eastbound State Route 58 will remain the same. Rosedale Highway is designated as an Arterial under the Circulation Element of the Metropolitan Bakersfield General Plan. The project includes a landscaping replacement plan for the landscaping and trees that will be removed by the proposal. The project site is 2.15 acres in size. Only state and local funds will be utilized for the project. Project construction will be staged in order to accommodate construction in the median and widening to the north and south. Phase 1 will limit the construction to widening on the north and south. Upon completion of the widening, Phase II will shift traffic to the newly constructed portion of the roadway and limit construction to the median area. A State Construction / Traffic Handling Plan will be included as part of the plan set.

Contact Information

Name
Marc Gauthier
Agency Name
City of Bakersfield
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield
Counties
Kern
Cross Streets
Highway 99 and Gibson Street
Zip
93308
Total Acres
2.15
State Highways
SR 58, Highway 99
Railways
AT & SF RR
Waterways
Kern River
Township
29 S
Range
27 E
Section
26
Base
MDBM

Notice of Determination

Approving Agency
City of Bakersfield
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print