San Lorenzo River Total Maximum Daily Load for Sediment, Including Certain Tributaries
Summary
SCH Number
2004029059
Lead Agency
Regional Water Quality Control Board, Region 3 (Central Coast), San Luis Obispo
Document Title
San Lorenzo River Total Maximum Daily Load for Sediment, Including Certain Tributaries
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2004
Document Description
The San Lorenzo River, and three of its tributaries, Carbonera Creek, Lompico Creek and Shingle Mill Creek, are listed as "impaired waters" under the Federal Clean Water Act, Section 303(d). The Central Coast Regional Water Quality Control Board (CCRWQCB) has prepared a Sediment Total Maximum Daily Load for the San Lorenzo River, Carbonera Creek, Lompico Creek, and Shingle Mill Creek to determine the assimilative capacity of the water bodies and to allocate sediment discharges so that they do not exceed this capacity, thus ensuring beneficial uses are protected and water quality objectives met. The Total Maximum Daily Load includes a technical report that describes sediment impacts to Beneficial Uses in these water bodies, evaluates sources of sediment, establishes numeric targets, and calculates total loads that would protect Beneficial Uses. It also includes an Impelementation Plan and Monitoring Plan. Together, these comprise the "project" in this finding.
Contact Information
Name
Dominic Roques
Agency Name
Regional Water Quality Control Board, Region 3 (Central Coast),
Contact Types
Lead/Public Agency
Phone
Location
Counties
Santa Cruz
Other Location Info
San Lorenzo Watershed
Notice of Determination
Approving Agency
Regional Water Quality Control Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.