Morro Bay Total Maximum Daily Load for Pathogens Including Chorro and Los Osos Creeks

Summary

SCH Number
2004029058
Lead Agency
Regional Water Quality Control Board, Region 3 (Central Coast), San Luis Obispo
Document Title
Morro Bay Total Maximum Daily Load for Pathogens Including Chorro and Los Osos Creeks
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2004
Document Description
Morro Bay is listed as an "impaired waterbody" under the Federal Clean Water Act, Section 303(d). The Central Coast Regional Water Quality Control Board has prepared a Morro Bay Total Maximum Daily Load for Pathogens for Morro Bay including Chorro and Los Osos Creeks to determine the assimilative capacity of the water bodies and to allocate federal coliform concentrations so that beneficial uses are protected and water quality objectives met. The Total Maximum Daily Load (TMDL) includes a Technicial Support Document that describes pathogenic impacts to beneficial uses in these waterbodies, evaluates sources of pathogens, establishes numeric targets, and calculates total loads (concentrations) that would protect beneficial uses. It also includes an implementation plan and monitoring plan. Together, these comprise the "project" in this finding.

Contact Information

Name
Shanta Keeling
Agency Name
Regional Water Quality Control Board, Region 3 (Central Coast),
Contact Types
Lead/Public Agency

Location

Cities
Morro Bay
Counties
San Luis Obispo

Notice of Determination

Approving Agency
Regional Water Quality Control Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print