Morro Bay Total Maximum Daily Load for Sediment, Including Chorro and Los Osos Creeks

Summary

SCH Number
2004029057
Lead Agency
Regional Water Quality Control Board, Region 3 (Central Coast), San Luis Obispo
Document Title
Morro Bay Total Maximum Daily Load for Sediment, Including Chorro and Los Osos Creeks
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2004
Document Description
The Morro Bay Estuary, and the two creeks that feed the bay, Los Osos and Chorro Creek, are listed as "impaired waters" under the Federal Clean Water Act, Section 303(d). The Centrral Coast Regional Water Quality Control Board (CCRWQCB) has prepared a Siltation Total maximum Daily Load for Chorro Creek, Los Osos Creek and the Morro Bay Estuary to determine the assimilative capacity, thus ensuring beneficial uses are protected and water quality objectives met. The Total Maximum Daily Load includes a technical report that desribes sediment impacts to Beneficial Uses in these waterbodies, evaluates sources of sediment, established numeric targets, and calculated total loads that would protect Beneficial Uses. It also includes an Implementation Plan and a Monitoring Plan. Together, these comprise the "project" in this finding.

Contact Information

Name
Dominic Roques
Agency Name
Regional Water Quality Control Board, Region 3 (Central Coast),
Contact Types
Lead/Public Agency

Location

Counties
San Luis Obispo
Other Location Info
Morro Bay Watershed

Notice of Determination

Approving Agency
Regional water Qaulity Control Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print