Temporary Water Pipeline Connection Between CCWA Pipeline and Lake Cachuma
Summary
SCH Number
2004028475
Public Agency
Central Coast Water Authority
(CCWA)
Document Title
Temporary Water Pipeline Connection Between CCWA Pipeline and Lake Cachuma
Document Type
NOE - Notice of Exemption
Received
Posted
2/26/2004
Document Description
The proposed project consists of approximately 1,350' of 24" diameter high density polyethylene (HDPE) pipeline. The temporary pipeline will start at an existing 24" blind flange in a vault near the base of the Bradbury Dam spillway. A valve will be placed on the pipeline at this location to allow the temporary pipeline to be isolated from the existing CCWA piping.
Contact Information
Name
William Brennan
Agency Name
Central Coast Water Authority
Contact Types
Lead/Public Agency
Phone
Location
Counties
Santa Barbara
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Sec 15261, 15269, 15301, 15303
Reasons for Exemption
The Central Coast Water Authority finds that the above-described project is exempt for the following reasons. First, the project has no potential for resulting in a reasonably foreseeable physical change in the environment, direct or indirect. Second, the project is a short-term, emergency response to a decrease in elevation of the lake. Third, the project twill modify existing facilities and constitutes work on an existing pipeline to maintain a continuous supply of water to Hilton Creek and to allow delivery of State Water Project water to Lake Cachuma, which are both ongoing activities previously analyzed for their environment effects. Fourth, the project is a minor alteration to an existing public facility. Fifth, the project is new construction of small structures.