Delta Service District Center Relocation/Construction Project
3 Documents in Project
Summary
SCH Number
2004022128
Lead Agency
California Conservation Corps
(CCC)
Document Title
Delta Service District Center Relocation/Construction Project
Document Type
NOD - Notice of Determination
Received
Posted
1/27/2014
Present Land Use
Public Facilities
Document Description
The previously approved project consisted of 52,000 square feet of new facilities that included an administration buildings, educational and recreational buildings, foru residential buildings, a multipurpose building, a hazardous materials storage shed, and a warehouse. The project also included a storm water retention basin proposed to be 8 feet deep and covering 28,000 square feet, and approximately 100,000 square feet of paved surfaces, which included a corporation yard, roadways, walkways, driveays, a plaza, a basketball court, and parking areas. The 2004 project rquired installation of utiltiy connections, which include a sewer line 8 inches in diameter and a water line between 12 to 16 diameter. The City of Stockton agreed to provide water and sewage services to the project. The project site is located near but not within the Stockton city limits, and the City of Stockton has requested a conditional water/sewer agreement that includes possible annexation of the site into the city. The new buildings are estimated to accomodate up to 111 Corps members and 35 employees.
Contact Information
Name
Valerie Namba
Agency Name
California Conservation Corps, DGS
Contact Types
Lead/Public Agency
Phone
Location
Cities
Stockton
Counties
San Joaquin
Cross Streets
Arch Road and Newcastle Road
Total Acres
20
State Highways
99
Airports
Stockton Metropolitan
Waterways
Weber Slough
Other Location Info
City: City of Stockton
Notice of Determination
Approving Agency
California Conservation Corps
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A