Office/Visitor Center Project

2 Documents in Project

Summary

SCH Number
2004022121
Lead Agency
California Department of Parks and Recreation
Document Title
Office/Visitor Center Project
Document Type
NOD - Notice of Determination
Received
Posted
4/1/2004
Present Land Use
Recreation
Document Description
Construct a new permanent, accessible park office/visitor center of approximately 2,800 square feet. The new facility will include a changing rooms, storage areas, laundry and utility room, kitchen, meeting room, exhibit space, and public restrooms. Construct or relocate site improvements related to the new park office/visitor center including a subsurface drainage system (surface water), the relocation of the existing fence to expand picnic area, walkway and ramps/steps to new building, identification and directional signage, and landscape. Connect utility to new office/visitor center including water, septic system, electricity, telephone, alarm system, and telecommunications infrastructure. The septic tank excavation will be approximately 8' Wide X 10' Long X 10' Deep, utility lines trenches will vary from 18-inches to 36-inches in depth and sewer line to 4-foot depth. Relocate existing park entrance to Mayfair Drive converting existing entrance to main exit and construct a 9,000 square feet of partially paved parking space to include 30 passenger car spaces, five bus spaces, and 13 non-paved overflow passenger spaces. Reconfigure existing parking lot layout to include for ADA parking spaces and construct a bus drop-off area. Install new accessible travel way connecting the existing parking with proposed new parking area.

Contact Information

Name
Michael Romo
Agency Name
Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Cities
Red Bluff
Counties
Tehama
Cross Streets
Adobe Road
State Highways
Interstate 5
Waterways
Sacramento River

Notice of Determination

Approving Agency
Department of Parks and Recreation

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print