Lake Aloha Dam Maintenance and Telemetry Station Installation
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2004022084
- Lead Agency
- El Dorado Irrigation District
- Document Title
- Lake Aloha Dam Maintenance and Telemetry Station Installation
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/22/2004
- Present Land Use
- United States Forest Land within the El Dorado National Forest
- Document Description
- The El Dorado Irrigation District (District) proposes to adopt a Mitigated Negative Declaration pursuant to the California Environmental Quality Act (Section 15000 et. seq., Title 14, California Code of Regulations) to conduct dam repairs and maintenance work at the Main Dam and Auxiliary Dams 4, 6, and 7 at Lake Aloha, and install a telemetry station at the Main Dam of Lake Aloha. A rodent and vegetation treatment program would be preformed as part of the long-term standard practices for the maintenance of the reservoir auxiliary dams. The proposed project falls entirely with the existing FERC license boundary at Lake Aloha in the USFS Desolation Wilderness Area.
- Contact Information
-
Jake Eymann
El Dorado Irrigation District
Lead/Public Agency
2890 Mosquito Road
Placerville, CA 95667
Phone : (530) 642-4068
Location
- Counties
- El Dorado
- Cross Streets
- Hwy 50
- Zip
- 95720
- Total Acres
- <1.0 Acres
- Parcel #
- U.S. Forest Service Land
- State Highways
- 50
- Waterways
- Lake Aloha & Pyramid Creek
- Township
- 11N
- Range
- 16E
- Section
- 17
- Base
- MDB&M
- Other Location Info
- City: Strawberry
Notice of Determination
- Approving Agency
- El Dorado Irrigation District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- El Dorado Irrigation District 2890 Mosquito Road Placerville, CA 95667
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.