Lake Aloha Dam Maintenance and Telemetry Station Installation

4 Documents in Project

Summary

SCH Number
2004022084
Lead Agency
El Dorado Irrigation District
Document Title
Lake Aloha Dam Maintenance and Telemetry Station Installation
Document Type
NOD - Notice of Determination
Received
Posted
4/22/2004
Present Land Use
United States Forest Land within the El Dorado National Forest
Document Description
The El Dorado Irrigation District (District) proposes to adopt a Mitigated Negative Declaration pursuant to the California Environmental Quality Act (Section 15000 et. seq., Title 14, California Code of Regulations) to conduct dam repairs and maintenance work at the Main Dam and Auxiliary Dams 4, 6, and 7 at Lake Aloha, and install a telemetry station at the Main Dam of Lake Aloha. A rodent and vegetation treatment program would be preformed as part of the long-term standard practices for the maintenance of the reservoir auxiliary dams. The proposed project falls entirely with the existing FERC license boundary at Lake Aloha in the USFS Desolation Wilderness Area.

Contact Information

Name
Jake Eymann
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
Hwy 50
Zip
95720
Total Acres
<1.0 Acres
Parcel #
U.S. Forest Service Land
State Highways
50
Waterways
Lake Aloha & Pyramid Creek
Township
11N
Range
16E
Section
17
Base
MDB&M
Other Location Info
City: Strawberry

Notice of Determination

Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print