New Water Wells - Community Domestic Water System Improvements for Community of Esparato

2 Documents in Project

Summary

SCH Number
2004022006
Lead Agency
Esparto Community Services District
Document Title
New Water Wells - Community Domestic Water System Improvements for Community of Esparato
Document Type
NOD - Notice of Determination
Received
Posted
4/19/2004
Present Land Use
Proposed project encompasses entire community.
Document Description
The major components of the proposed water system improvements include: I. Two new water wells capable of producing 500 gpm each, with new hydropneumatic tanks and diesel generators; II. Construct "existing" 500,000-gallon storage tank plus additional 260,000-gallon storage tank, or two new wells in excess of 500 gpm each; III. Approximately 12,600 linear feet of new distribution piping; including isolation valves and fire hydrants; IV. Further investigation and possible remediation of contamination at one existing water well; V. Upgrade of all existing well control and discharge piping, including hydropneumatic tanks if necessary; VI. Provision of full SCADA controls for entire water system; and VII. Provision of water service meters.

Contact Information

Name
David Herbst
Agency Name
Esparto Community Services District
Contact Types
Lead/Public Agency

Location

Counties
Yolo
Cross Streets
Entire Town
Zip
95627
Total Acres
Entire Town
State Highways
16
Railways
Abandoned
Waterways
Cache Creek, Winters Canal, Willow Slough, and Lamb Valley Slough
Other Location Info
Esparato

Notice of Determination

Approving Agency
Esparto Community Services District
Approving Agency Role
Lead Agency

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print