Valley Nature Education Center

2 Documents in Project

Summary

SCH Number
2004021094
Lead Agency
City of Clovis
Document Title
Valley Nature Education Center
Document Type
NOD - Notice of Determination
Received
Posted
4/6/2004
Present Land Use
Vacant, Water Basin; R-A (Rural Residential); Park and Water Basin.
Document Description
The City of Clovis and the Fresno Metropolitan Flood Control District (FMFCD), in conjunction with the California Department of Fish and Game, Clovis Unified School District, and Fresno Rescue and Wildlife Rehabilitation (FWR), have proposed the development of a nature education center to be located within the City of Clovis. The proposed facility will be located on land previously acquired by the City of Clovis for park site, as well as on land purchased by the FMFCD as a storm water basin and flood detention basin. The primary purpose of FMFCD's land will remain storm water management, but this location has been determined to be suitable for a dual use as a recreational facility. The site will feature a wildlife rehabilitation program, fishing lakes, nature trails, an outdoor amphitheater, and adequate onsite parking. (EA 2001-24).

Contact Information

Name
Ryan Burnett
Agency Name
City of Clovis
Contact Types
Lead/Public Agency

Location

Cities
Clovis
Counties
Fresno
Cross Streets
Sierra Avenue and Temperance Avenue
Zip
93612
Total Acres
~151
Parcel #
Multiple
State Highways
168
Waterways
Dry Creek, Enterprise Creek, Gouls Canal

Notice of Determination

Approving Agency
City of Clovis
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print