Assessment District No. 9 Water Pipeline

3 Documents in Project

Summary

SCH Number
2004021081
Lead Agency
Eastern Municipal Water District (EMWD)
Document Title
Assessment District No. 9 Water Pipeline
Document Type
NOD - Notice of Determination
Received
Posted
5/3/2004
Present Land Use
Rural Residential / Zoning & General Plan - Southwest Area Plan as part of Riverside County General Plan - Hearing Draft.
Document Description
The proposed project will consist of the installation of approximately 12,700 lineal feet of 8 and 12-inch diameter water transmission pipeline within the public rights-of-way of existing unpaved roads including Thompson Road, Galleano Avenue, Maddalena Road, and Shrimp Lane located between Pourroy Road on the west and Shrimp Road on the east. All work will be limited to the public rights-of-way of the existing unpaved roads. Construction activity will consistof trenching, laying of pipe, and backfill and compaction. There will be no paving, the roads will remain dirt. Upon completion, the water transmission pipeline will provide efficient, reliable potable water service to existing residents.

Contact Information

Name
Karen Hackett
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
Various
Zip
92596
Parcel #
Various
State Highways
79
Township
7S
Range
2W
Section
4
Base
SBBM
Other Location Info
Winchester

Notice of Determination

Approving Agency
Eastern Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print