Beverly Boulevard Phase III Widening and Replacement of Beverly Boulevard Bridge Over Rio Hondo Channel

2 Documents in Project

Summary

SCH Number
2004021042
Lead Agency
Los Angeles County
Document Title
Beverly Boulevard Phase III Widening and Replacement of Beverly Boulevard Bridge Over Rio Hondo Channel
Document Type
NOD - Notice of Determination
Received
Posted
1/30/2006
Present Land Use
Residential / Commercial
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2005-0706-R5 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Mr. Edward Dingman of the Los Angeles County Department of Public Works. The operator proposes to alter the streambed and banks by the reconstruction and expansion of the Beverly Boulevard Bridge over Rio Honda Channel, tributary to Los Angeles River. The proposed project consists of replacing the existing timber-steel girder portion of the bridge with a concrete structure, reconstructing the portion of the bridge destroyed by a fire with a concrete structure, and the widening of the existing concrete portion of the bridge from 70 feet to 90 feet wide. Impacts shall be limited to the extension of abutment Nos. 1 and 7 and pier and footing Nos. 2, 3, 4, 5, 6 by twenty-four linear feet (permanent impacts) and the removal and replacement of approximately 8,000 sq. ft. of concrete channel bottom (temporary impact). The jurisdictional channel is concrete lined in the project's vicinity. No native riparian habitat shall be impacted as a result of the proposed projects.

Contact Information

Name
Naeem Siddiqui
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Montebello
Counties
Los Angeles
Cross Streets
Montello Blvd to Rea Drive
Zip
90640

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print