East Campus Infrastructure Improvemets, UCR #950403

2 Documents in Project

Summary

SCH Number
2004021025
Lead Agency
University of California, Riverside
Document Title
East Campus Infrastructure Improvemets, UCR #950403
Document Type
NOD - Notice of Determination
Received
Posted
4/14/2004
Present Land Use
Public Facilities and Institutions.
Document Description
The proposed project consists of coordinated infrastructure upgrades to eliminate current deficiencies and provide the utility capacity necessary to support planned growth in student enrollment. The proposed project would provide improved distribution of chilled water, steam (building heating), condensate return, primary (high voltage) power, water and sewer service on the portion of the campus located east of Interstate 215/State Route 60. Construction methods will include traditional trenching, pipe-bursting and lining of existing facilities. In addition, installation of equipment to provide additional water pumping capacity and chiller capacity are included. All distributed areas will be restored following construction.

Contact Information

Name
Tricia D. Thrasher
Agency Name
University of California, Riverside
Contact Types
Lead/Public Agency

Location

Cities
Riverside
Counties
Riverside
Cross Streets
University Avenue./Canyon Crest Drive.
Zip
92507
Parcel #
253-100-002
State Highways
SR60/I-215
Railways
AT&SF RR
Schools
Highland & Hyatt Elementry/University Hts MS/NorthHS
Township
2
Range
4
Section
29
Base
San Bern
Other Information
Base: San Bernardino

Notice of Determination

Approving Agency
University of California, Riverside Campus
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print