Lake Elsinore Striped Bass Release

2 Documents in Project

Summary

SCH Number
2004021009
Lead Agency
Lake Elsinore and San Jacinto Watersheds Authority (LESJWA)
Document Title
Lake Elsinore Striped Bass Release
Document Type
NOD - Notice of Determination
Received
Posted
3/26/2004
Document Description
For the Lake Elsinore Striped Bass Release Project, 5,000 striped bass or hybrids (striped bass x white bass cross) will be released into Lake Elsinore starting in the winter and spring of 2004. These fish will be released to determine the effectiveness of such stocking to control the threadfin shad and carp populations. Striped bass and hybrids are being proposed because they are effective predators of shad and juvenile carp and both could quickly grow to large size necessary to prey upon pelagic schooling fish like threadfin shad. Neither striped nor hybrids will reproduce in the lake because they spawn in rivers and the San Jacinto River does not provide adequate spawning habitat nor the sustained high volume of freshwater flow to Lake Elsinore required to keep the semi-buoyant eggs suspended in the current long enough to successfully hatch.

Contact Information

Name
Mark R. Norton
Agency Name
Lake Elsinore and San Jacinto Watersheds Authority
Contact Types
Lead/Public Agency

Location

Cities
Lake Elsinore
Counties
Riverside
Cross Streets
Lakeshore Drive
Zip
92587
Airports
Skylark Recreational Airport
Waterways
San Jacinto River, Temescal Wash

Notice of Determination

Approving Agency
Lake Elsinore & San Jacinto Watersheds Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print