Town of Windsor Russian River Water Supply Facility Improvements - Well 11

2 Documents in Project

Summary

SCH Number
2004012112
Lead Agency
Town of Windsor
Document Title
Town of Windsor Russian River Water Supply Facility Improvements - Well 11
Document Type
NOD - Notice of Determination
Received
Posted
3/23/2004
Present Land Use
Vineyard, LIA B6 60 acres/unit Z F1 F2 BR, LIA B6 60 acres/unit Well Field, Public/Quasi Public, Public/Quasi Public
Document Description
The proposed project consists of construction of a new well, Well 11, and appurtenances. Well 11 would be located approximately midway between existing Wells 9 and 10, and would be sized to produce approximately 1,100 gallons per minute (gpm) when operated in conjunction with the Town's four existing well sat the Russian River Well Field. The new well would consist of a hole drilled approximately 110 feet deep. A casing and well screen with an approximate diameter of 16 inches would be installed in the well shaft. The well pump would be a vertical turbine with the pump motor sized at approximately 150 horsepower.

Contact Information

Name
James Smith
Agency Name
City of Windsor
Contact Types
Lead/Public Agency

Location

Cities
Windsor
Counties
Sonoma
Cross Streets
Eastside Road, Windsor River Road
Zip
95492
Total Acres
2
Parcel #
066-310-008 and 026
State Highways
US 101
Railways
Northwestern Pacific
Schools
Windsor High Sotoyome School
Waterways
Russian River
Township
8N
Range
9W
Section
9&10
Base
MDBM

Notice of Determination

Approving Agency
Town of Winsdor
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print