Fort Ross Water System Repairs
5 Documents in Project
Summary
SCH Number
2004012100
Lead Agency
California Department of Parks and Recreation
Document Title
Fort Ross Water System Repairs
Document Type
NOD - Notice of Determination
Received
Posted
5/16/2005
Present Land Use
Recreation
Document Description
As part of the redevelopment of the water supply system for Fort Ross State Historic Park, two pipeline crossings of Fort Ross Creek will be reconstructed. Both new crossings will bridge the creek. At Location 1, just upstream of the "Archy Camp" the existing water line attached to a rotting log, which spans the creek, will be removed and a new water line will be installed using a pipe suspension system supported by concrete piers on either side of the stream. The concrete piers will be set at least 10 feet back from top-of-bank. At Location 2, just upstream of Highway 1, the water line will cross the stream in a six-inch carrier tube supported by concrete piers on either side of the stream. The concrete piers will be set at least seven feet back from top-of-bank. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2005-0136-3 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Bill Orme / California State Parks Dept.
Contact Information
Name
Bill Cox
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Address
Phone
Location
Counties
Sonoma
Cross Streets
Highway 1 / Old Fort Ross Road
State Highways
1
Railways
No
Airports
No
Schools
No
Other Location Info
Park Unit: Fort Ross State Historic Park
District: North Bay District
City: Jenner
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.