County of Ventura Saticoy Operations Yard

3 Documents in Project

Summary

SCH Number
2004011127
Lead Agency
Ventura County
Document Title
County of Ventura Saticoy Operations Yard
Document Type
NOD - Notice of Determination
Received
Posted
5/10/2004
Present Land Use
Prime Ag Land
Document Description
The General Plan Amendment (GPA 04-02) to the Saticoy Area Plan was to modify the existing Circulation Map of the Saticoy Area Plan. The Zone Change (Z-2954) allowed the rezoning of approximately 23.8 acres of the 24.9 acres from "M-2" (Limited Industrial) to "M-1" (Industrial Park) on portions of APN's 090-0-110-250, 260 and 040. The Planned Development Permit (PD-1955) allows the construction and operation of a County Operations Yard for County Governmental Agency and Departmental uses. The facilities will be comprised of two main structures and several small outbuildings totaling approximately 99,423 sf of structures. Two fuel islands, each with two pumps and two fuel storage tanks, will be located adjacent to each other on site. An enclosed truck wash station will be located adjacent to the fuel islands. Some outdoor/open type sheds; storage bins, and storage racks will also be located on the site. The balance of the site will be utilized as parking and circulation, open space, and landscaped areas.

Contact Information

Name
Kim Rodriguez
Agency Name
Ventura County, Planning Division
Contact Types
Lead/Public Agency

Location

Counties
Ventura
Cross Streets
Jacinto Avenue
Zip
93004
Total Acres
24.9
Parcel #
090-0-110-25, 26, 27 & 04
State Highways
118
Railways
So. Pacific Railroads
Schools
Ventura Unified School District
Other Location Info
San Buenaventura, Satiroy

Notice of Determination

Approving Agency
County of Ventura
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print