Verhelle Bridge Replacement at Santa Barbara Airport

3 Documents in Project

Summary

SCH Number
2004011027
Lead Agency
City of Santa Barbara
Document Title
Verhelle Bridge Replacement at Santa Barbara Airport
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2004
Present Land Use
Airport Facilities zones. General Plan: Major Public and Institutional
Document Description
The project consists of replacing the Verhelle Road Bridge on Santa Barbara Airport property. The existing Verhelle Bridge is a two-lane bridge across San Pedro Creek located on the east side of the Santa Barbara Airport. The bridge provides access to several Airport tenants from Fairview Avenue. The bridge is old and in deteriorating condition. In addition, the creek banks at the bridge are eroding due to the floods of 1995 and 1998. The Airport has determined that the existing bridge should be replaced due to its poor condition, and the potential failure of the creek banks at the bridge abutments.

Contact Information

Name
Sara Iza
Agency Name
City of Santa Barbara
Contact Types
Lead/Public Agency

Location

Cities
Goleta, Santa Barbara
Counties
Santa Barbara
Cross Streets
Fairview and Los Carneros
Total Acres
Affected: 0.52
Parcel #
073-450-003
State Highways
101
Railways
Amtrak
Airports
Project Site
Schools
UCSB; Kellogg School; Goleta Valley Jr. High School
Waterways
Pacific Ocean / Goleta Slough

Notice of Determination

Approving Agency
City of Santa Barbara
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print