McAlister Production Well Development Program

2 Documents in Project

Summary

SCH Number
2004011017
Lead Agency
City of Big Bear Lake
Document Title
McAlister Production Well Development Program
Document Type
NOD - Notice of Determination
Received
Posted
2/17/2004
Present Land Use
Land uses vary from residential to floodway.
Document Description
The proposed project is the drilling of a new production well just east of McAlister Road located on the south side of Bear Valley. The drilling and development of the well will take approximately 45 days, of which 10 to 12 days would include 24 hour drill activity. Upon completion of the geophysical logging, the pilot borehole will be enlarged and well casing and filter pack will be installed. For permanent operation, a submersible pump will be located inside the well approximately 300 feet below the surface of the ground. The well will be enclosed in a 15-foot by 20-foot wood frame construction building designed and painted to blend with the surrounding buildings.

Contact Information

Name
Scott Heule
Agency Name
City of Big Bear Lake
Contact Types
Lead/Public Agency

Location

Cities
Big Bear Lake
Counties
San Bernardino
Cross Streets
Johnny Way and Fox Farm Road
Total Acres
>1
State Highways
18
Airports
Big Bear Airport
Waterways
Big Bear Lake
Township
2N
Range
1E
Section
22
Base
SBM

Notice of Determination

Approving Agency
City of Big Bear Lake Department of Water and Power
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print