Aquatic Pesticide Application Program for the Turlock Irrigation District
5 Documents in Project
Summary
SCH Number
2003122100
Lead Agency
Turlock Irrigation District
Document Title
Aquatic Pesticide Application Program for the Turlock Irrigation District
Document Type
NOD - Notice of Determination
Received
Posted
2/2/2004
Present Land Use
Open Space, Agricultural land / Urban/Developed and Agricultural land uses.
Document Description
The Proposed Project is the continuation of an aquatic pesticide application program by Turlock Irrigation District since 1975. The program was previously regulated in 2002 and 2003 under the State Water Resources Control Board (SWRCB) Statewide General National Pollutant Discharge Elimination System (NPDES) Permit for Discharge of Aquatic Pesticides (Water Quality Order No. 2001-12-DWQ, General Permit No. CAG990003). The proposed program would occur under a new General Permit in 2004 and is expected to be equivalent to the current program. The proposed program would be implemented for a period of approximately 5 years, or for the term of the new General Permit.
Contact Information
Name
Debra Liebersbach
Agency Name
Turlock Irrigation District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Ceres, Hughson, Modesto, Turlock
Counties
Merced, Stanislaus
Total Acres
150,000
State Highways
99
Railways
BNSF, UP
Airports
Turlock
Waterways
San Joaquin, Tuolomne and Merced Rivers
Other Location Info
Denair, Delhi, Keyes, La Grange and Ballico
Notice of Determination
Approving Agency
Turlock Irrigation District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.