McHenry Library Addition and Renovation

4 Documents in Project

Summary

SCH Number
2003122097
Lead Agency
University of California Santa Cruz
Document Title
McHenry Library Addition and Renovation
Document Type
NOD - Notice of Determination
Received
Posted
10/1/2004
Present Land Use
P-F (Public Facilities)
Document Description
Project will renovate the existing 161,700 GSF McHenry Library and construct a new 116,550 GSF addition to the existing library. The 1.5-acre building site is in the center of the UCSC campus, north of the Arts and Academic Resources Center, southeast of Kerr Hall and "Science Hill," and southwest of Hahn Student Services. The project also includes: improvements to the existing service road along the west side of the library; reconfiguration of parking lots; landscaping; pedestrian pathways, an outdoor entry plaza, site lighting and improved disabled site access; relocation of the library loading / service dock and associated parking; development of a new bicycle path and provision of bicycle parking facilities; installation of a Stormwater management system; and installation of utility connections. A new 65,000 gallon, 20-foot tall water storage/tank system will be added to the existing chiller plant of the Earth & Marine Sciences (EMS) building located near the EMS building. It will chill water for the addition and renovated library during low energy demand periods (evening) and have chilled water available for the completed project at peak demand periods during the day. Area of disturbance includes 2.85-acres.

Contact Information

Name
John Barnes
Agency Name
University of California
Contact Types
Lead/Public Agency

Location

Cities
Santa Cruz
Counties
Santa Cruz

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.