El Corte de Madera Creek Open Space Preserve Watershed Protection Program
3 Documents in Project
Summary
SCH Number
2003122091
Lead Agency
Midpeninsula Regional Open Space District
Document Title
El Corte de Madera Creek Open Space Preserve Watershed Protection Program
Document Type
NOD - Notice of Determination
Received
Posted
2/10/2004
Present Land Use
General Open Space / Resource Management, Timber Preserve
Document Description
The purpose of the project is to protect and restore the long-term integrity of the El Corte de Madera Creek watershed by reducing erosion and potential sedimentation associated with the design and use of the 35 mile network of unpaved roads and recreational trails within El Corte de Madera Creek Open Space Preserve. The project includes four elements: design upgrades and physical improvements to the roads and trails for long-term erosion control; changes to the Preserve Trails Plan to close, restore, and realign problem trail segments; implementation of long-term maintenance and monitoring activitites; and environmental education and outreach efforts.
Contact Information
Name
Matt Freeman
Agency Name
Midpeninsula Regional Open Space District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Woodside
Counties
San Mateo
Cross Streets
Highway 35 and Bear Gulch Road
Zip
94062
Total Acres
2,877
Parcel #
067-390-170, 075-350-010
State Highways
35
Waterways
El Corte de Madera Creek
Township
6S
Range
4W
Section
16-21
Base
MtDiablo
Notice of Determination
Approving Agency
Midpeninsula Regional Open Space District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.