Rio Del Oro Specific Plan

7 Documents in Project

Summary

SCH Number
2003122057
Lead Agency
City of Rancho Cordova
Document Title
Rio Del Oro Specific Plan
Document Type
NOD - Notice of Determination
Received
Posted
9/6/2023
Document Description
Since the Final EIR was issued in 2010 for the Rio Del Oro Specific Plan Project, SMUD has evaluated the path of the 69kV electric lines and locations of the substations. Based on currently intended/proposed development, SMUD has refined the siting of the first two substations within the 1,100-acre Phase 1 area and associated 69kV lines/connections. The proposed substations would be located within the previously evaluated project area boundaries identified for the Rio Del Oro Specific Plan Project EIR. The path of the 69kV lines have been modified to include a northern off-site line extension that would include up to five utility poles. Anticipated energization date of the first substation have been identified for 2024, with construction beginning in the fourth quarter of 2023, and the estimated energization date of the second substation is 2028. No changes in powerline design, construction methods, and/or function are being proposed as part of this document.

Contact Information

Name
Kim Crawford
Agency Name
Sacramento Municipal Utility District
Job Title
Environmental Specialist
Contact Types
Responsible Agency

Location

Cities
Rancho Cordova
Counties
Sacramento
Regions
Citywide
Other Location Info
The project site, as evaluated in the 2006 Draft EIR/EIS, is located in the eastern part of Sacramento County, south of U.S. Highway 50, within the City of Rancho Cordova. The project property is located south of White Rock Road, north of Douglas Road, and east of Sunrise Boulevard.
Other Information
Since the Final EIR was issued in 2010 for the Rio Del Oro Specific Plan Project, SMUD has evaluated the path of the 69kV electric lines and locations of the substations. Based on currently intended/proposed development, SMUD has refined the siting of the first two substations within the 1,100-acre Phase 1 area and associated 69kV lines/connections. The proposed substations would be located within the previously evaluated project area boundaries identified for the Rio Del Oro Specific Plan Project EIR. The path of the 69kV lines have been modified to include a northern off-site line extension that would include up to five utility poles. Anticipated energization date of the first substation have been identified for 2024, with construction beginning in the fourth quarter of 2023, and the estimated energization date of the second substation is 2028. No changes in powerline design, construction methods, and/or function are being proposed as part of this document. Figure 2 shows revisions to the proposed 69kV line and substation location. The majority of the proposed realignment of 69kV line would be located within the previously evaluated project area boundaries identified for the certified EIR. No changes in substation and powerline design, construction methods, and/or function are being proposed

Notice of Determination

Approving Agency
Sacramento Municipal Utility District
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
https://www.cityofranchocordova.org/departments/community-development/planning/planning-division-document-library

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.