Lassen Lodge Forest Fire Station - Facility Relocation

2 Documents in Project

Summary

SCH Number
2003122045
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Lassen Lodge Forest Fire Station - Facility Relocation
Document Type
NOD - Notice of Determination
Received
Posted
2/3/2004
Present Land Use
Upland Agriculture
Document Description
Project entails new construction, on a 2.5 acre state-owned site, of a CDF two-engine forest fire station which includes two primary buildings-a 3,753 +\- square feet, single-story barracks building, and a 1,999 +\- sq. ft., 3-bay apparatus (engine storage) building, and three minor buildings, including a 120+\- sq. ft. utility storage building, a 512 +\- sq. ft. office building, and a 475 +\- sq. ft. pump house/generator storage building. Ancillary improvements to be constructed incldue a 35 to 50-foot radio/communication tower, a paved driveway easement through the Cal Trans right-of-way along south side of Highway 36 onto the project area with a circular driveway on the project area, an above-ground fuel storage unit, concrete walkways, flagpoles, three, 500 to 1,000 gallon propane tanks, a fire hose wash rack and concrete pad, compound parameter fencing, a new CDF road sign along Highway 36, and general landscaping. Additional support features consist of a new domestic water well and a septic system with leach field. Project also includes demolition of three small, vacant concrete block storage buildings and trailer storage pads presently at the project site.

Contact Information

Name
L.E. Luke Wilson
Agency Name
Department of Forestry And Fire Protection
Contact Types
Lead/Public Agency

Location

Counties
Tehama
Cross Streets
Paynes Creek Loop, Lane Valley Road
Zip
96075
Total Acres
2.5
State Highways
36
Schools
Paynes Creek Elementary
Waterways
Paynes Creek
Township
29N
Range
1W
Section
25
Base
MDBM
Other Location Info
Paynes Creek

Notice of Determination

Approving Agency
California Department of Forestry and Fire Protection
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.