Lake or Streambed Alteration Agreement No. R1-06-0519
4 Documents in Project
Summary
SCH Number
2003122015
Lead Agency
California Department of Transportation, District 1
Document Title
Lake or Streambed Alteration Agreement No. R1-06-0519
Document Type
NOD - Notice of Determination
Received
Posted
6/23/2008
Present Land Use
Agriculture and residential use
Prime/Ag/Exclusive/60-acres minimum and Ag/Ex/60-ac. min. and Natural Resources.
Document Description
Construct two permanent bridges, remove two existing bridges, install one multiple log and boulder scour structure, install, maintain, and remove one fish exclusion zone (FEZ), install and remove one temporary stream crossing, install and remove a water bladder, restore 1.72 acres of riparian area, and utilize one water drafting site on the Mad River, Humboldt County. The project will also restore fish passage for all life stages of salmonids at road/stream crossings on Mill (Watek) Creek, and Hall Creek, Humboldt County.
Contact Information
Name
Scott Bauer
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Arcata
Counties
Humboldt
Cross Streets
US Route 101, Post Mile 89.1 to Route 90.4
Total Acres
1.3mi.ofhighway
State Highways
US Route 101&200
Waterways
Mad River
Township
6N
Range
8
Section
1E
Base
HumMer.
Other Location Info
Mckinleyville
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.