Chevron Estero Marine Terminal Source Removal Project, Agreement 2008-0161-R4
3 Documents in Project
Summary
SCH Number
2003121160
Lead Agency
San Luis Obispo County
Document Title
Chevron Estero Marine Terminal Source Removal Project, Agreement 2008-0161-R4
Document Type
NOD - Notice of Determination
Received
Posted
12/31/2008
Document Description
The California Dept. of Fish & Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish & Game Code to the Project applicant, Mr. John Westenberger. The applicant proposes to excavate ~32,200 cubic yards of soil and water containing petroleum hydrocarbons from 3 sites on the Estero Marine Terminal. Two of the three sites are outside of the Department of Fish & Game's jurisdiction. At the third site, willow trees immediately adjacent to Toro Creek would be trimmed for access and sheet pile would be driven ~8 ft deep into the ground to prevent bank collapse. Soil would be excavated and transported for disposal or treatment at an approved off-site facility, while contaminated groundwater would be treated and disposed of treatment water through an existing wastewater outfall system at the site. The excavated site would be backfilled using 3 inch crushed concrete rubble below groundwater level and compacted soil on top of the concrete rubble. The sheet pile would then be removed from the ground and the site approved the Project described above on November 18, 2008, and has made the following dterminations regarding the above described Project.
Contact Information
Name
Mike Hill
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Morro Bay
Counties
San Luis Obispo
Cross Streets
State Highway 1 near Toro Creek Road
Total Acres
25
State Highways
Hwy. 1
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.