San Joaquin Freshwater Marsh Reserve Phase II Restoration Plan

4 Documents in Project

Summary

SCH Number
2003121017
Lead Agency
University of California, Irvine
Document Title
San Joaquin Freshwater Marsh Reserve Phase II Restoration Plan
Document Type
NOD - Notice of Determination
Received
Posted
1/21/2005
Present Land Use
Within UC Irvine Long Range Development Plan as UC Natural Reserve System Freshwater Marsh Reserve
Document Description
SAA #1600-2004-0375-R5 Alter the streambed and banks through the implementation of the San Joaquin Marsh Phase II Restoration Project (Project). The project proposes the following restoration activities: 1) removal of 4,000 lineal feet of existing levees which impede flow through the marshland, 2) excavation of marsh vegetation (consisting of cattails) to restore lost open water/mudflat habitat, 3) installation of a new pipeline along the main east-west levee to provide the flexibility to be able to pump water through the marsh system and selected marsh units with a portable pump.

Contact Information

Name
Donna Cobb
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Irvine
Counties
Orange
Cross Streets
Campus Drive and University Drive
Zip
92697
Total Acres
202
State Highways
I-405, SR73
Airports
Orange County
Schools
UC Irvine
Waterways
San Diego Creek
Township
6S
Range
9W
Base
Tustin

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes