Oxbow Preserve
3 Documents in Project
Summary
SCH Number
2003112094
Lead Agency
City of Napa
Document Title
Oxbow Preserve
Document Type
NOD - Notice of Determination
Received
Posted
1/25/2007
Present Land Use
Existing undeveloped land with MP: Master Plan District / FP: Flood Plain Overlay District (Zoning) and MU 461: Mixed Use (General Plan)
Document Description
The Operator proposes to create a 12.7 acre Preserve on the Napa River in the oxbow just north of Copia American Center for Wine, Food, and the Arts on First Street in Napa, Napa County. The project proposes to restore a depressional wetland on the upper floodplain terrace, install and anchor deadwood logs and snags to prevent further erosion of the bank, expand the brackish marsh, remove non-native vegetation and plants natives, reconnect the box elder seep to the Napa River, and install trails for public access. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2006-0162-3 pursuant to Section 1602 of the Fish and Game Code to the project operator, Cassandra Walker / City of Napa.
Contact Information
Name
Greg Martinelli
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Napa
Counties
Napa
Cross Streets
McKenzie Drive (north); Soscol Avenue (west)
Zip
94559
Total Acres
12.7
Parcel #
045-090-013; 045-100-001
State Highways
121, 29
Railways
NVRR
Schools
Alta Heights, Oxbow, New Technology, St. Johns
Waterways
Napa River, Napa Creek
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.