Bradmoor Island and Arnold Slough Restoration Project [Native Plant Protection Act Incidental Take Permit No. 2081-2020-014-03
24 Documents in Project
Summary
SCH Number
2003112039
Lead Agency
California Department of Fish and Wildlife, Bay Delta Region 3
(CDFW)
Document Title
Bradmoor Island and Arnold Slough Restoration Project [Native Plant Protection Act Incidental Take Permit No. 2081-2020-014-03
Document Type
NOD - Notice of Determination
Received
Posted
7/2/2021
Document Description
The Project includes removing water control structures, culverts and bulkheads; removing debris; constructing a beach seine monitoring ramp; breaching levees in strategic locations; grading down sections of levees; filling ditches near breach locations; stockpiling excess levee material; and transplanting, maintenance and monitoring of Mason’s lilaeopsis (Lilaeopsis masonii). The Project will retore tidal hydrology to approximately 607 acres on Bradmoor Island and approximately 137 acres at Arnold Slough.
The Project will result in permanent impacts to approximately 5.42 square feet of Mason’s lilaeopsis. The project is expected to result in incidental take of Mason’s lilaeopsis, which is designated as a rare species under the NPPA. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under NPPA that may occur as a result of Project implementation.
Contact Information
Name
Andy Rockrvier
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Counties
Solano
Regions
San Francisco Bay Area
Other Location Info
The Project is located in the northeastern section of Suisun Marsh, approximately 8.5 miles southeast of the City of Fairfield, at a Latitude 38.190841, Longitude -121.921019, in Solano County.
Notice of Determination
Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Lead Agency
Approved On
County Clerk
Solano
Final Environmental Document Available at
The Addendum to the Environmental Impact Report prepared by the responsible agency for the Project is available to the general public at the office location listed above for the responsible agency. CDFW’s administrative record of proceedings related to the project and the incidental take permit is available to the public for review at CDFW’s regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.