Homeland and Romoland Area Master Drainage Plans and Homeland/Romoland Area Drainage Plan

4 Documents in Project

Summary

SCH Number
2003111131
Lead Agency
Riverside County Flood Control and Water Conservation
Document Title
Homeland and Romoland Area Master Drainage Plans and Homeland/Romoland Area Drainage Plan
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed project consists of revisions of two existing Master Drainage Plans (MDPs), amendment of the existing Area Drainage Plan (ADP), and construction and subsequent maintenance of the proposed drainage facilities. Revisions will be made to the current MDP for the Romoland area (Romoland MDP Revision No. 1), the current MDP for the Homeland area (Homeland MDP Revision No. 1) and the Homeland/Romoland Area Drainage Plan (Homeland/Romoland ADP Amendment No. 2). The ADP for the Homeland/Romoland Area is a funding mechanism for construction of the proposed facilities contained in each of the MDPs being addressed.

Contact Information
Teresa Tung
Riverside County Flood Control and Water Conservation
1995 Market Street
Riverside, CA 92501

(951) 955-1233

Location

Cities
Menifee Perris
Counties
Riverside
Cross Streets
various
State Highways
215
Railways
BNSF
Airports
Perris Valley Aiport
Schools
Romoland Elementary
Waterways
San Jacinto River
Township
5S
Range
3, 2W
Section
1,8-18
Base
SBB&M
Other Location Info
Communities: Homeland and Romoland
Other Information
Sections: 7-9,

Notice of Determination

Approving Agency
Riverside County Flood Control and Water Conservation District
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Riverside County Planning Department 4080 Lemon Street Riverside, CA 92501

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search